We are humbled to serve key clients and have delivered water solutions to landmark regional projects including Burj Khalifa, The Mecca Royal Clock Tower, Yas Island Marina Circuit, The Presidential Palace – Ras Al Akhdar and many more.

Year: 2009
City: Dubai, UAE
Client: Emaar Properties
Contractor: ETA-Voltas-Hitachi Plant (Joint Venture)
Consultant: Hyder
Products: Lowara & Vogel Transfer & Booster Sets & Hydrovar Variable Speed Drives

The word burj is Arabic for tower & Burj Khalifa named in honour of the President of the UAE, Sheikh Khalifa bin Zayed bin Sultan Al Nahyan, is the world’s tallest building. The triple lobed footprint of the building is based on the shape of the Hymenocallis desert flower native to the United Arab Emirates. The tower is also the centre piece of Downtown Burj Khalifa, a large scale mixed-use development. Burj Khalifa stands not only for unparalleled luxury, but with a height of over 828 metres, is both an architectural accomplishment and a testimony of human achievement. The structure takes its place in history as one of the world’s great landmarks.
ARJ supplied and installed Lowara SV series and Vogel MP series water transfer sets (11KW-200KW) and Lowara SV, SHE and SHS series water booster sets (4KW-37KW). The water booster sets are fitted with Hydrovar, a bespoke variable speed drive (VSD) designed for pumping applications. The Hydrovar varies pump speed to ensure the water flow rate meets demand so motors run efficiently and energy is not wasted. Each set comprises 2 duty + 1 standby pump. The sets are factory assembled at the Lowara facilities located in Vicenza, Italy

Year: 2009
City: Mecca, Saudi Arabia
Client: General Authority for the Holy Mosque
Contractor: Saudi Bin Ladin Group
Consultant: Dar Al-Handasah
Products: ABS Submersible Sewage Pumps AFP, Vogel MP Pumps & SPP Horizontal Thrustream Axial Split Case Pump

The Development of King Abdul Aziz Endowment (DOKAAE) project is one of the world’s largest mixed-use complexes and overlooks the Holy Haram in Mecca, Saudi Arabia. It consists of a large podium, topped by seven towers. These include six residential towers, a five star hotel in the middle, the Mecca Royal Clock Hotel Tower the tallest of its kind in the world at just over 600 metres, an observatory deck, a convention centre, a shopping centre and car parks. Spanning a diameter of 43 meters, the Royal Clock, six times larger than London’s Big Ben, sits atop the central tower.
Connected to DOKAAE by a 1 km under ground tunnel, are 5 pumping stations to prevent the overflow of water. ARJ supplied and installed 3 AFP series ABS submersible sewage pump sets for the chiller plant culvert and also MP series Vogel horizontal multistage pump sets, power rated 45kW - 160KW, for clean water pumping. ARJ Water Technology also supplied SPP Horizontal Thrust Stream axial split case pump TD25A (250/30) & TD15A (150/30) for the chilled water system.

Year: 2016
City: Dubai
Client: Jumeirah Group
Contractor: BK Gulf
Consultant: CKR
Products: Sulzer XFP, Sanimat and Mixer

The Madinat Jumeirah Phase 4 Development is a 450 key 5 star luxury hotel resort that is positioned between The Mina Al Salam and The Al Qasr Hotels in terms of the product offering. Several tenant restaurants are to be provided and these are to be easily accessible to non-resident diners – Turtle Lagoon. The new development provides the physical link between the existing Jumeirah resorts on either side and is to connect with its neighbors in such a manner that the hotel guests can easily access the greater resort of the Madinat. The architecture of the resort is to be a comfortable visual transition between Jumeirah Beach Hotel/The Burj Al Arab and the Madinat resort. The architecture reflects a contemporary interpretation of typical Arabic architecture.
ARJ Water Technology used Sulzer XFP Pumps range which are the best in the market for the usage for submersible wastewater application, it is designed for use in terminal engineered pumping stations, whilst using the Premium Efficiency IE3 standards for the pump motor combined with Sulzer compact submersible mixers which is designed as a compact, water pressure-tight unit ensures that the wastewater from the Madinat Jumeirah is safely disposed of to the assigned pumping station

Year: 2014
City: Abu Dhabi
Client: The Executive Committee for The Presidential palace
Contractor: Drake & Scull
Consultant: Evan
Products: ABS Submersible Sewage Pumps AS & Piranha

The United Arab Emirates’ new Presidential Palace is to be found on the Ras Al Akhdar peninsula adjacent to the Emirates Palace Hotel. Covering 150 hectares it assumes a built up area of over 160,000 square metres. This government office contains several VIP wings, a ministers’ wing and a number of majlis and dining halls. In addition to a beautiful, majestic fountain courtyard, the common areas and ancillary buildings include a media hall and a press centre, a mosque, a public majlis and military accommodation. Further, this significant undertaking also comprises construction of a 6 metre high seawall, 2,000 metres in length.
For the new Presidential Palace, ARJ supplied and installed ABS submersible sewage pumps AS & Piranha for the waste water application.

Year: 2012
City: Kuwait City
Client: Mabanee Co. SAK
Contractor: Megatechnique
Consultant: Pan Arab Consulting Engineers
Products: Ebara EVMG & LPS Pumps, ABB Variable Frequency Drive, Centralised Water Heaters, Doha GRP Tanks.

Located close to the centre of Kuwait City, The Avenues has set a benchmark for high quality retail in the region and is the arguably its premier shopping, lifestyle and entertainment destination. This enormous scheme takes reference from the great cityscapes and retail locations around the world and reflects many of the building styles in North America, Europe and the Middle East.
Positioned above the exclusive fashion outlet Harvey Nichols in the Grand Avenue section of the mall, ARJ General Trading has, for the comfort of the exclusive London based store’s shoppers, supplied and installed Ebara EVMG triplex booster sets controlled by an ABB variable frequency drive, 18kW Centralised commercial water heaters of 120 gallon capacity, Ebara LPS duplex circulation pump sets and control panels, and Doha GRP tanks for the hygienic storage of water.

Year: 2015
City: Port Saeed, Dubai
Client: Dubai International Real Estate
Contractor: Habtoor Leighton Group
Consultant: Kling Consult
Products: Sulzer XFP Sewage Pumps

he work done by ARJ Water Technology in collaboration with Dubai International Real Estate, Habtoor Leighton and Kling Consult ensured the delivery of the best in class pumping solutions that caters for the Jewel of the Creek Project, which is a Multi-Use development, including four and five star hotels, furnished serviced apartments, convention centre, ballroom, office buildings, landscaping and marina. The contract value to the main contractor is valued at $395 Million US Dollars.
ARJ Water Technology used the Sulzer Submersible Sewage Pumps Type Sulzer XFP with a range from 2.9-11 Kilo Watts that is designed for use in connecting the wastewater to the municipality utility line. Sulzer XFP model uses Premium-Efficiency IE3 motors.

Year: 2015
City: Dubai
Client: Emaar Properties
Contractor: Arabtec Construction LLC & EFECO
Consultant: Engineering Consultants
Products: Xylem Lowara CEA Boosters Pumps and Pressure Kits

Envisioned by Emaar Properties, Dubai’s premier developer, Reem is a blueprint for the urban family community. Contemporary 21st century living at its best, Reem breaks new ground with a host of avant-ultramodern retail, recreation and leisure offerings moments from your doorstep. At its nucleus Reem’s shopping avenue and entertainment zones are the pulse of this satellite community. A radial network. of tree-lined boulevards with dedicated pedestrian and cyclist paths provide residents seamless access to a plethora of world class amenities. Driven by a family-centric mantra, Reem offers six million square feet of the city’s finest leisure, entertainment, retail and social facilities for a spectrum of ages and choices. Apart from the community hub, residential parcels also enjoy neighborhood swimming pools, sports courts, retail centers and pocket parks as well as mosques and schools
ARJ Water Technology supplied and installed 1582 Xylem Lowara Stainless Steel IS-304 threaded Single Impeller pumps; that is designed for pumping water from the DEWA line to the villas and buildings of Reem Development-Mira Community

Year: 2008-2009
City: Muscat, Oman
Client: Oman’s Waterfront Investment (SAOG)
Contractor: Al Turki Enterprises
Consultant: W. S. Atkins
Products: Lowara FHE & CA Booster Sets

The Wave plans upon completion in 2012, to be a mesmerizing new development on the Sultanate of Oman’s shoreline. The Wave combines more than 4,000 beautiful properties, a 300-yacht berth marina, Greg Norman signature golf course, three premier hotels and new retail, leisure and dining opportunities at a bewitching seafront address. This is the first integrated resort and residential development to be undertaken in the greater Muscat region.
ARJ supplied and installed FHE 11KW and CA 1.5KW ITT Lowara booster sets comprising of 1 duty and 1 standby pump complete with a control panel designed to work in tandem with the irrigation systems that operate the sprinklers used for landscaping

Year: 2017
City: Abu Dhabi
Client: Abu Dhabi National Oil Company (ADNOC)
Contractor: Dhabi Contracting LLC
Consultant: Altorath Consulting Engineering
Products: Xylem Lowara e-SV

Introduction
One of ADNOC’s biggest success stories is the transformation of Ruwais, located 240 kilometers west of Abu Dhabi city, from a remote desert site to a modern industrial city. ADNOC created the Ruwais Housing Complex in 1980, a multi-million-dollar investment that provides residential facilities for employees of the Ruwais Industrial Complex, our downstream operations hub. Distributed over a geographical boundary of 15 km2 this complex includes over 7,000 residential units – ranging from one-bedroom apartments to four-bedroom, double-story ‘executive’ villas – and features a number of recreation parks, planted with more than 22,000 trees. The expansion of the Ruwais Housing Complex included the building of 663 villas with a land area of about 2,100,000 meters squared.
ARJ Water Technology used Xylem – Lowara WRAS and ACS certified e-SV range stainless Multi-Stage pumps to ensure water is pumped and flows continuously to the residents of the Ruwais Housing Complex.

Year: 2016
City: Dubai
Client: Emaar
Contractor: Main Contractor: Arabtech, Mep Contractor: Efeco
Consultant: Algurg Consultants
Products: Xylem Lowara e-HM

The project involves construction of 382 Spanish style villas comprising a ground floor and an additional floor. The project will feature pictureque walkways and luscious green spaces and the residents will also have easy access to the vibrant community centre, health & fitness facilities, day care centre’s, mosques and educational institutions.
ARJ Water Technology used Xylem – Lowara WRAS and ACS certified e-HM range stainless pumps Multi-Stage pumps to ensure water connected from the Dubai Water and Electricity Authority is flowing constantly with high efficiency and water is boosted to the higher floors.

Year: 2014
City: Dubai
Client: Four Seasons Resort Jumeirah
Contractor: Trans Gulf
Consultant: Hyder
Products: Lowara e-SV & HMS Transfer Sets, e-SV booster Sets, CA Circulation Set, ABS Submersible Sewage Pumps XFP & AS

Mandated to transform Saudi Arabia’s water and waste water infrastructure, the National Water Company has recently undertaken a project to overhaul Khumrah Effluent Pumping Station, serving the same Sewage Treatment Plant and subsequently Jeddah’s population. Although the station has the capacity to allow for raw sewage, treated effluent from this plant is intended for reuse in irrigation. It is designed to collect all treated effluent from Khumrah STP’s 1 to 4, and at a later stage STP 5. Effluent can also be discharged to the sea approximately 20 kilometres away with minimal impact on the environment. This pumping station is expected to be in operation in mid 2014.
For the Four Seasons, ARJ supplied and installed Lowara HMS, e-SV and CA clean water pumps respectively for the purpose of transfering water from one tank to another, providing pressurised water on tap and hot water circulation. ARJ also supplied and installed ABS submersible sewage pumps XFP and AS for the waste water application

Year: 2013
City: Jazan, KSA
Client: King Abdullah Bin Abdul Aziz Foundation for Development Housing Dedicated to His Parents
Contractor: Beijing Emirates Int'l Construction Co.
Consultant: Zuhair Fayez Partnership Consultants
Products: Lowara HMS Centrifugal Pumps & e-SV Duplex Booster Sets, SPP Fire Pumps

King Abdullah Bin Abdul-Aziz Foundation for Development Housing Dedicated to His Parents was established as a charitable foundation aiming at providing appropriate housing for those in need amongst Saudi society.
For the Foundation, ARJ supplied Lowara HMS horizontal multistage centrifugal electric pumps, Lowara e-SV sets for pressure boosting and SPP horizontal split case electric and diesel driven fire pumps.

Year: 2016
City: Dubai
Client: Dubai Municipality
Contractor: Bin Ladin
Consultant: Alturath Engineering
Products: Xylem Lowara e-SV

Dubai Safari will have a geographically distributed exhibit of animals over a
number of main villages, the visitors are transported between the major
attractions by eco-friendly solar powered vehicles to guarantee a unique
experience; With the objective to provide a unique recreational and educational
attraction through comprehensive displays of local and foreign animal species,
the project consists of 8 major Zones including an Entrance Plaza, Children Zoo,
Arabian Safari, Asian village, African Village, Safari Village, Al Wadi and service
with an area of 119 hectares.
ARJ Water Technology used Xylem – Lowara WRAS and ACS certified e-SV range stainless Multi-Stage pumps to ensure water is boosted, transferred, pumped and flows continuously in the Dubai Safari and ensure that the visitors enjoy their journey in the park.

Year: 2013
City: Abu Dhabi
Client: Mubadala Development
Contractor: BK Gulf
Consultant: WSP
Products: Lowara e-SV Booster Sets, ABS Submersible Sewage Pumps XFP & AS, ABS Piranha Submersible Grinder Pumps

New York University Abu Dhabi (NYUAD) first opened in the UAE in 2008 running public events; academic conferences, workshops, and performances. In 2010 it offered courses in the liberal arts and enrolled its first 150 students. The facility plays an integral part in an international axis that includes the same universities in New York and Shanghai.
2014 represents a move to a new site in the Marina district of Saadiyat Island, with a facility designed by Rafael Viñoly Architects, and built by Al-Futtaim Group Carillion.
For New York University Abu Dhabi, ARJ supplied and installed Lowara e-SV pressure boosting sets, ABS submersible sewage pumps XFP and AS, and ABS Piranha submersible grinder pumps for the waste water application.

Year: 2017
City: Jumeira, Dubai
Client: Al Wasl
Contractor: Al Basti & Muktha LLC. Mep Contractor: Bilt Middle East LLC
Consultant: Ian Banham & Associates (Iba)
Products: Xylem Lowara e-SV

The project involves the construction of a resort which includes a seven-storey
five-star hotel with two basement levels. The hotel will offer 257 rooms including
suites and beach villas. The hotel amenities will include physical fitness rooms,
tennis and squash courts, a club for children and a range of retail shops and a
garden. The hotel will also offer a multi-purpose hall and a business center. The
project will have a built-up area of 67,490 square meters.
ARJ Water Technology used Xylem – Lowara WRAS and ACS certified e-SV range stainless Multi-Stage pumps to ensure water is boosted, transferred, pumped and flows continuously in the Dubai Jumeirah Beach Club Resort.